ACCESS
- 1km to the M9 Waterford to Dublin motorway
- Situated on the N25 Cork to Rosslare Port route
- Close (10 mins) to Port of Waterford
- Easy access to Waterford Airport (EU connections)
- 116 km (72 miles, 90 mins.) to Cork Airport (EU/US connections)
ELECTRICITY SUPPLY
- Up to 20 MVA Power Supply available
- 38 KV ESB sub-station located adjacent to the site
- 110KV and 220KV stations in close proximity to the site (See Eirgrid map under Useful Links – view map at Waterford in the South-East of the country)
- Potential to generate 5-9 megawatts of wind power on adjoining Glanbia owned lands
ENVIRONMENTAL ASSESSMENT
- Full assessment of this predominantly greenfield site confirms the clean status across the greenfield (84%) and brownfield (16%) area.
WATER SUPPLY
- Unlimited supply through a dedicated 20cm high pressure water mains
- 45cm water pipeline running adjacent to the site
WASTE WATER TREATMENT
- New waste water treatment plant planned, with modular extension possible, at Adamstown adjacent to the tidal river Suir
- Integrated Constructed Wetlands (ICW) System on adjacent Glanbia owned farmland with 70,000 sq. mt. of treatment ponds and potential capacity of circa 5,000 PE
|
|
NATURAL GAS
- Available gas supply is 2,500 SCMH (standard cu. mt. per hour)
- Piped to an on-site pressure reduction station reducing the line pressure from 19 bar to 2 bar
- Potential to service on-site CHP plant
TELECOMMUNICATIONS
- Broadband facilities available in Kilmeaden
- Mobile network mast onsite
LOCAL AMENITIES
- Employees of Kilmeaden Fields can enjoy facilities adjacent to the site including a convenience food store, post office, pharmacy, restaurant, garage and filling station and a regular public transport link to and from Waterford City.
- This site is suitable for both large industry and small or emerging businesses.
USEFUL LINKS
www.idaireland.com
www.enterprise-ireland.com
www.waterfordchamber.ie
www.investinwaterford.ie
www.discoverwaterfordcity.ie
www.eirgrid.com


|